|
No.
|
Project
Title
|
Owner
|
Client
|
Completion
Date
|
|
1.
|
Chemical Cleaning for
Cliff Head ‘A’ Platform (ROC Oil)
|
|
HL Engineering (M) Sdn
Bhd-Lumut
|
Dec
2005
|
|
2.
|
Provision of Supply
Manpower, Equipment, Tools and Chemicals complete the procedure for the chemical cleaning job for
E-8202 Bucs Calandria at Derivatives Plant
|
|
Optimal
Chemicals (M) Sdn Bhd
|
Oct
2005
|
|
3.
|
Chemical
Cleaning / Acid Cleaning at FPSO Bunga Kertas
|
|
Vastalux Sdn
Bhd
|
Dec
2005
|
|
4.
|
Provision of
Manpower, Equipment, Tools, Materials and Consumables for Hot Water Cleaning Services of Fibrebond
20HV-FDA Pipe Spools for Talisman
|
Talisman
Malaysia Limited
|
Pacific Advance
Composites Sdn Bhd
|
July
2005
|
|
5.
|
Supply of
Manpower,Chemical Cleaning/Water Flushing for Chilled Water Pipeline at Proposed Business Hotel
KLCC
|
|
Sunway Construction
Sdn Bhd
|
Jan
2006
|
|
6.
|
Chemical Cleaning for
Steam Lines (3 Circuits)
|
|
Toyo Engineering
& Construction Sdn Bhd
|
Aug
2006
|
|
7.
|
Chemical Cleaning of 5
Sets of Spare Cooler
|
TNBH SJ
Kenyir
|
TNB
Generation
|
Dec
2005
|
|
8.
|
Provision of Manpower,
equipment, material and consumables for chemical cleaning works for TLE Heat Exchanger furnace no.
6.
|
|
Optimal Chemicals (M)
Sdn Bhd
|
Jun
2006
|