Segi Perkasa (M) Sdn Bhd

The Smart Way To Our Engineering Solutions

 
 

2005

 

 

No.

Project Title

Owner

Client

Completion Date

 1.

Chemical Cleaning for Cliff Head ‘A’ Platform (ROC Oil) 

 

HL Engineering (M) Sdn Bhd-Lumut 

 Dec 2005

 2.

Provision of Supply Manpower, Equipment, Tools and Chemicals complete the procedure for the chemical cleaning job for E-8202 Bucs Calandria at Derivatives Plant 

 

 Optimal Chemicals (M) Sdn Bhd

 Oct 2005

 3.

 Chemical Cleaning / Acid Cleaning at FPSO Bunga Kertas

 

 Vastalux Sdn Bhd

 Dec 2005

 4.

 Provision of Manpower, Equipment, Tools, Materials and Consumables for Hot Water Cleaning Services of Fibrebond 20HV-FDA Pipe Spools for Talisman

 Talisman Malaysia Limited

 Pacific Advance Composites Sdn Bhd

 July 2005

 5.

Supply of Manpower,Chemical Cleaning/Water Flushing for Chilled Water Pipeline at Proposed Business Hotel KLCC

 

Sunway Construction Sdn Bhd 

 Jan 2006

 6.

Chemical Cleaning for Steam Lines (3 Circuits) 

 

 Toyo Engineering & Construction Sdn Bhd

 Aug 2006

7.

Chemical Cleaning of 5 Sets of Spare Cooler

TNBH SJ Kenyir

TNB Generation

Dec 2005

8.

Provision of Manpower, equipment, material and consumables for chemical cleaning works for TLE Heat Exchanger furnace no. 6.

 

Optimal Chemicals (M) Sdn Bhd

Jun 2006