No.
|
Project
Title
|
Owner
|
Client
|
Completion
Date
|
|
1.
|
Compressor Complete
With Piping Cleaning
|
EMSB
|
Toyo Engineering &
Construction Sdn Bhd
|
Dec
2008
|
|
2.
|
STACC & ABC Fins
Chemical Cleaning
|
Tenaga Nasional
Berhad
|
TNBG SJ Jambatan
Connaught
|
Feb
2009
|
|
3.
|
Chemical Cleaning of
Unit 1 Boiler
|
Kapar Energy
Ventures
|
Kapar Energy Ventures
Sdn Bhd
|
Jan
2009
|
|
4.
|
Provision of Flushing
and Chemical Cleaning for New Pipelines
|
Murphy Sarawak Oil Co.
Ltd
|
Murphy Sarawak Oil Co.
Ltd
|
Oct
2008
|
|
5.
|
Chemical Cleaning
Works for Shell GTG Pipings
|
Petronas Carigali Sdn
Bhd
|
Mset Engineering Corp
Sdn Bhd
|
Sept
2008
|
|
6.
|
Chemical Cleaning for
SS Piping & Filter Coalescer Vessel-Angsi Power Gas System Skid, Internal Chemical Cleaning of
Incoloy 825 Piping for Shell GTG Skid Project
|
Petronas Carigali Sdn
Bhd
|
Mset Engineering
Corp Sdn Bhd
|
Aug
2008
|
|
7.
|
To Supply Labour, PPE, Test
Kits, Other Overheads to Perform and Complete The Acid Cleaning Works for FG
Line |
|
Ramunia Fabricators
Sdn Bhd
|
Aug
2008
|
|
8.
|
Chemical Cleaning of
Unit 2 Boiler
|
Kapar Energy
Ventures
|
Kapar Energy Ventures
Sdn Bhd
|
June
2008
|
|
9.
|
For the Work External
Chemical Cleaning of GT1 Fin Fan Cooler at Stesen Janaelektrik Gelugor, Provision of Manpower,
Rental of Equipment, Material, and Consumable Items to Perform the Chemical
Cleaning
|
Tenaga National
Berhad
|
Stesen Janaelektrik
Gelugor, Bahagian Penjanaan
|
June
2008
|
|
10.
|
Chemical Cleaning
Works for 2 Units of SQE Furnaces for Optimal Olefin Plan at Dialog Kertih Old Workshop for Optimal
Chemical (M) Sdn Bhd, Chemical Cleaning & Waste Management Services
|
Optimal Chemicals Sdn
Bhd
|
Dialog Plan Services
Sdn Bdh
|
Apr
2008
|
|
11.
|
Chemical Cleaning for
GRE Portable Water Supply of Manpower, Equipment and Other Consumables Items for GRE Piping Woks
for Bunga Orkid-A (BOA) CPP Topside
|
|
|
|
|
12.
|
Chemical Cleaning
Works for BOA to BOD Bridge
|
Talisman Malaysia
|
Ramunia Fabricators
Sdn Bhd
|
Jan2008
|